Thejo Engineering

NSE: THEJO

Sector: Industrials

Industry: Engineering & Construction

About Thejo Engineering

⛏️⚙️ Thejo Engineering: 62% Services + 43% Engineered Products + 600+ Customers

• Incorporated: 1986; engineering solutions across Bulk Material Handling + Mineral Processing + Corrosion Protection.
• Evolution: Conveyor-belt service provider → integrated engineering solutions company.
• 9MFY26 revenue mix: Services Units **62% + Manufacturing Units 34% + Others 4%**.
• 9MFY26 products/services mix: Integrated Services **57% + Engineered Products 43%**.
• Customer base: **600+ global customers** across Mining + Metals + Cement + Power + Chemicals + other core sectors.
• Workforce: **2,300+ employees**.
• Lifecycle model: Products + Services + O&M, including commissioning, shutdown management and long-term rate contracts.
• Core industries: Mining + Mineral Processing + Steel + Aggregates/Sand + Power + Chemicals/Fertilisers + Cement + Ports.
• 🎯 Takeaway: Thejo is a service-heavy engineering platform with recurring O&M capabilities layered onto engineered products and industrial solutions.

🌍🏭 Global Platform: ~30% Exports + 4 Manufacturing Units + 3,600 TPA Capacity

• Geographic presence: India + Saudi Arabia + Australia + Brazil + Chile + UAE.
• Export contribution: **~30% of revenue**.
• Asia-Pacific: Core revenue-driving region.
• Manufacturing footprint: **4 integrated units** in Chennai’s Ponneri Taluk.
• Built-up area: **~208,000 sq. ft.** across rubber compounding, moulding, polyurethane casting, fabrication and corrosion protection.
• Current manufacturing capacity: **3,600 tonnes p.a.**
• Current utilisation: **~80%**.
• International workshops: Saudi Arabia + Australia + UAE + Brazil + Chile, supporting testing and polymer expertise.
• Special Purpose Machinery: Autoclaves + Curing Presses + Hose-Building + Retort Machines; 24×7 O&M and KPI-based contracts.
• Operating reach: **15 centres across 45+ client locations** for rapid deployment.
• 🌍 Takeaway: Thejo combines India-based manufacturing with international workshops and an asset-backed service network spanning multiple mining and industrial markets.

🚀🔬 Capacity Expansion: ₹40 Cr Capex + 2,600 TPA Addition + 25+ Patents

• Expansion capex: **₹40 Cr** approved in Aug 2025.
• Capacity addition: **~2,600 TPA** over the 3,600 TPA base; targeted completion by **mid-2026**.
• Post-expansion capacity: **~6,200 TPA (derived)**.
• Routine annual capex: **₹15–25 Cr**, funded internally.
• FY26 term loan: **₹10 Cr** supplementing internal funding for capex.
• R&D: **DSIR-approved in-house R&D + Technical Excellence Centre**.
• Innovation focus: Rubber Engineering + Wear Solutions + Import Substitution.
• IP base: **25+ patents**.
• Thejo Australia: Company currently holds **74%** stake; Bridgestone Mining Solutions Australia had approval to sell its 26% stake at book value, with transactions contemplated by Mar 2025.
• 🌱 Growth levers: Capacity expansion + higher utilisation + engineered products + recurring O&M + export growth.
• 🎯 Takeaway: The next phase is capital-efficient but capacity-led, with ~2,600 TPA incremental manufacturing capacity backed by internal funding, technical IP and recurring service revenues.