Sunflag Iron & Steel

NSE: SUNFLAG

Sector: Capital Goods

Industry: Iron & Steel Products

About Sunflag Iron & Steel

🏭 Sunflag Iron & Steel: Integrated Plant + 78.2% Long Products + 4.98 Lakh MT Steel Melting

• Established: 1984; operations started: 1989.
• Integrated plant: Warthi, Bhandara, Maharashtra.
• Production chain: Sponge Iron → Sinter → Hot Metal → Captive Power → Steel Melting → Casting → Rolling → Heat Treatment → Bright Bars.
• FY26 revenue mix: Long Products 78.2% + Pig Iron 16.3% + Sponge Iron 5.5%.
• FY26 Steel Melting/SMS & VIM production: 4,97,506 MT.
• FY26 Rolled Products: 4,67,540 MT; Hot Metal/Pig Iron: 4,71,652 MT.
• FY26 Direct Reduction: 1,56,397 MT; captive power generation: 1,577.16 lakh kWh.
• Secondary metallurgy: ESR + VIM + VAR for high-specification steels.
🎯 Takeaway: Sunflag combines upstream steelmaking with specialised downstream processing across a vertically integrated platform.

✈️ Defence & Aerospace: Special Alloys + 12 Countries + NADCAP/AS9100D

• Product portfolio: Flat Bars + Round Bars + Bright Bars + Wire Rods + Ingots.
• Steel grades: Alloy + Spring + Ball-Bearing + Valve + Stainless Steel.
• End markets: Auto + Heavy Engineering + Railways + Defence + Aerospace + Nuclear + Petrochemicals.
• Super Alloy facility supplies bars, billets, plates and rings for aircraft, defence systems, space vehicles and nuclear reactors.
• FY26 exports: 2.91% of turnover; domestic reach across 19 states; exports to 12 countries.
• FY26 new grades: 17CrNiMo6 + 21-4N valve steel + Inconel 625 + AMS 6509 + large-size tool/die steels.
• Certifications: ISO 9001 + IATF 16949 + ISO 14001 + ISO 45001 + AS9100D/EN9100 + PED + NADCAP.
• Approved/qualified customers include VSSC, HAL, BrahMos, DRDO, NPCIL, Paras Defence + Adani Defence.
🎯 Takeaway: Specialised grades, certifications and qualified defence/aerospace customers support higher-value applications.

⛏️ Growth Platforms: 8.15 MT Coal Reserves + 71.34 MW Solar + Plant Upgrades

• Belgaon underground coal mine: 8.152 MT estimated reserves; ~3.5 MT extractable balance.
• Mineral portfolio: Iron Ore + Manganese + Coal + Phosphorite blocks.
• Bhivkund Coal Block: mining lease executed Apr'26; clearances in process.
• Surjagad 6 Iron Ore Block: exploration commenced May'26.
• Tambia South Coal Block: successful bidder May'26; CMDPA signed May'26.
• ReNew Green MPR Three: 31.2% stake; 71.34 MW solar project.
• Sunsure Solarpark Thirty Seven: 36.27% stake; 11 MW AC / 16.5 MWp DC captive solar project.
• Ramesh Sunwire: 49% JV for alloy-steel wire; ongoing upgrades include annealing furnaces, Auto UT, billet grinder, VD-3 + coke injection systems.
🎯 Takeaway: Mining access, captive renewables and plant modernisation create additional integration and efficiency platforms.