🪵 Stylam Industries: 12.24 Mn Sheets + 74% Exports + 80+ Countries
• Stylam is a decorative-laminates and specialty-surfaces manufacturer under the STYLAM brand, with products spanning HPL, specialty surfaces, PU+ lacquer coatings, solid surfaces and compact laminates.
• FY26 sales: 12.24 Mn sheets vs 11.7 Mn in FY25.
• FY26 revenue geography: Exports 74% vs 71% in FY25; Domestic 26% vs 29%.
• Export footprint: 80+ countries, including Netherlands, Italy, Saudi Arabia, Malaysia, USA, Canada, Qatar, Thailand and South Korea.
• Product portfolio includes Kitchenate, Play & Slay, Stella, healthcare/lab laminates, metallic/flicker finishes, TouchMe anti-fingerprint laminates, prelam boards and GlossPro+.
🎯 Takeaway: Stylam is strongly export-oriented, with 74% of FY26 business coming from overseas markets and 12.24 Mn sheets sold during the year.
🏭 20 Mn Sheet Capacity + 74% Utilisation + 80-Acre Manufacturing Base
• Manufacturing footprint: one of Asia’s largest single-location laminate plants, spread across 80 acres.
• Annual laminate production capacity: ~20 Mn sheets; FY26 utilisation 74%.
• Largest laminate press in India: 28 daylights with 1,860 × 4,320 mm press area.
• Hot Coating technology capacity: 1 Mn laminates/year; 100% acrylic solid-surface capacity: 3,00,000 panels/year.
• Stylam is described as India’s largest laminate manufacturer, a global pioneer in Hot Coating Process technology and the first Indian company to introduce PU+ Lacquer Coating process.
🎯 Takeaway: The existing plant provides substantial scale and specialised manufacturing capability, with FY26 laminate utilisation leaving additional headroom within the stated capacity.
🚀 4.8 Mn New Sheets + ₹334 Cr Capex + ₹300 Cr FY27 Revenue Target
• New greenfield laminate plant at Manak Tabra, Panchkula, Haryana: ~4.8 Mn sheets/year across various sizes.
• FY26 project capex incurred: ₹334 Cr.
• Commissioning timeline: end-Jun to mid-Jul 2026, after delays from earlier Nov 2025 and Mar 2026 timelines; management attributed delays mainly to regulatory approvals.
• Management expects the new plant to generate ~₹300 Cr revenue in FY27.
• Capacity addition of 4.8 Mn sheets represents ~24% of the existing 20 Mn-sheet annual laminate capacity (derived).
• FY27 revenue growth expectation: ~20–25%.
🎯 Takeaway: The Panchkula project materially expands manufacturing capacity, with FY27 growth expectations linked to commissioning and ramp-up of the new facility.